|
|
|
|
Terrell Colquitt Road Improvements |
Terrell, Texas |
|
KSA Engineers, Inc. was hired by The City of Terrell to assist in the design and construction of the Colquitt Road Improvements. KSA designed and administered the construction of this project that widened and existing 2 lane asphalt road to a 2 lane concrete road with a continuous turning lane. The project was approximately 3,000 linear feet and included 3,000 linear feet of 12 inch water line and 1,150 feet of sanitary sewer lines. Also included in the project was the construction of a storm sewer system, traffic signals, and 2,050 lf of sidewalk adjacent to the Herman Furlough, Jr., Middle School. Services provided by KSA Engineers, Inc. included boundary and topographic surveying, preparation of a ROW map, development of plats and descriptions for property transfer, a geotechnical investigation, pavement design, horizontal and vertical geometrics design, signage and marking design, storm sewer design, and the design of water and sewer lines. KSA was fully responsible for surveying, preparation of plans and specifications, and the administration of the bidding process and the construction. KSA also provided a project representative during construction and provided construction material testing using a subcontract with a testing laboratory north. |
|
|
|