Kilgore Maverick Drive Improvements (Phase II)
Kilgore, Texas
Kilgore Maverick Drive Improvements (Phase II)
KSA, Engineers, Inc. was hired by the City of Kilgore to design and construct a concrete roadway to replace a deteriorated asphalt
roadway through Kilgore’s North Industrial Park.

Concrete pavement was selected due to the high volume of large trucks through the park. The existing asphalt on the roadway, curb,
and gutter was removed and slight horizontal and vertical changes were made.

The roadway section consisted of 8.5" of concrete pavement with curb on 8" of lime stabilized subgrade. An existing drainage structure
was extended and headwalls, riprap, and guardrails were added. Two sections of existing water line were adjusted to accommodate
the roadway changes
Bastrop Colony MUD 1E Section 1
Deer Park Detention Study for 3 City Parcels
Diboll Dogwood Ridge Street Improvement
Grand Prairie Mayfield Road Improvements
Hico Safe Routes to School Sidewalks
Hondo Drainage Improvements, Project
Huntington Safe Routes to School
Kilgore Maverick Drive Improvements
Leander Bagdad Road
Llano Downtown Sidewalk and Lighting
Longview 1999-2001 Street Reconstruction
Longview Beaumont Street Reconstruction
Longview Tyler Street Reconstruction
Lufkin Paul Avenue Improvements
Lufkin Safe Routes to School Sidewalk
Lufkin Sayers Street
McKinney Oak Street Reconstruction
Mount Pleasant FM 1402 at IH-30
Selma Park Estates Subdivision 5 & 6
Selma Site Plan City of Selma Police Station
Seven Points TxCDBG Street Improvements
Southlake Drainage Master Plan Ph 2 SW3P
Sugar Land East GA Complex - Phase 1
Sugar Land Fire Station No. 1 and No. 7
Sugar Land L.I.D. No. 2 Culvert Headwall
Taylor Safe Routes to School
Terrell 2004 Street & Utility Rehabilitation
Terrell Colquitt Road Improvements
Tyler Sidewalk Improvements
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access