Terrell 2004 Street & Utility Rehabilitation Project
Terrell, Texas
KSA Engineers, Inc. worked with the City of Terrell to reconstruct eight city residential and commercial streets, totaling more than 12,300 feet of pavement reconstruction.  Most of the city streets were reconstructed with lime or cement-treated subgrade, crushed stone flexible base material and asphalt pavement.  One of the city streets was reconstructed with 7” of reinforced concrete pavement.  All the streets required some form of drainage improvements, either by improved roadside ditches and culverts, or replaced curbs and gutters.

Before the streets were reconstructed, all the city water and sewer lines were replaced under this construction contract.  More than 8,000 feet of gravity flow sanitary sewer lines were replaced, as well as more than 9,000 feet of water lines with numerous service re-connections.  All construction within the street ROW had to be coordinated and sequenced to allow residents optimum use of their driveways and access to their houses.

KSA provided field topographic surveying and property surveying for easement and right-of-way acquisitions.  The firm coordinated through a sub-consultant to obtain sufficient geotechnical investigations and recommendations for pavement reconstructions.  KSA provided design, bidding, and construction administration services for the city and provided construction inspection services with an on-site project representative during the construction phase.

The construction of the project was completed within the contract time frame.

Bastrop Colony MUD 1E Section 1
Deer Park Detention Study for 3 City Parcels
Diboll Dogwood Ridge Street Improvement
Grand Prairie Mayfield Road Improvements
Hico Safe Routes to School Sidewalks
Hondo Drainage Improvements, Project
Huntington Safe Routes to School
Kilgore Maverick Drive Improvements
Leander Bagdad Road
Llano Downtown Sidewalk and Lighting
Longview 1999-2001 Street Reconstruction
Longview Beaumont Street Reconstruction
Longview Tyler Street Reconstruction
Lufkin Paul Avenue Improvements
Lufkin Safe Routes to School Sidewalk
Lufkin Sayers Street
McKinney Oak Street Reconstruction
Mount Pleasant FM 1402 at IH-30
Selma Park Estates Subdivision 5 & 6
Selma Site Plan City of Selma Police Station
Seven Points TxCDBG Street Improvements
Southlake Drainage Master Plan Ph 2 SW3P
Sugar Land East GA Complex - Phase 1
Sugar Land Fire Station No. 1 and No. 7
Sugar Land L.I.D. No. 2 Culvert Headwall
Taylor Safe Routes to School
Terrell 2004 Street & Utility Rehabilitation
Terrell Colquitt Road Improvements
Tyler Sidewalk Improvements
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access