Streets &  Drainage
Taylor Safe Routes to School
Taylor, Texas
Taylor Safe Routes to School
KSA Engineers, Inc. assisted the City of Taylor in the planning, development, design, and construction of their Safe Routes to School
project.  Beginning with the creation of a Safe Routes to School Plan and TxDOT Application for the City and School District, KSA helped
pursue and secure funding through the federal grant program.  Extensive planning and environmental analysis was completed by KSA
to determine the safest, most cost effective, and accessible sidewalk routes as well as secure the proper State approvals for the
proposed improvements. 

During design, input was gathered from the community via multiple public hearings and presentations on the proposed improvements.
KSA incorporated this community input and worked continuously with the City, TxDOT, and other stakeholders to develop the most
desirable sidewalk improvements for Taylor’s students and the general community.

The project included more than 12,000 feet of variable width sidewalk connecting surrounding neighborhoods with three Taylor
schools.  The proposed routes were designed to expand on existing park and neighborhood pedestrian infrastructure to improve and
connect even more schools and residences to the City’s overall pedestrian and hike & bike system.  Notable features of the project
include unique alignments through established neighborhoods to accommodate and preserve homeowners’ landscaping and
innovative road-side culvert modifications to bridge over a drainage channel while keeping costs low and under budget.
Bastrop Colony MUD 1E Section 1
Deer Park Detention Study for 3 City Parcels
Diboll Dogwood Ridge Street Improvement
Grand Prairie Mayfield Road Improvements
Hico Safe Routes to School Sidewalks
Hondo Drainage Improvements, Project
Huntington Safe Routes to School
Kilgore Maverick Drive Improvements
Leander Bagdad Road
Llano Downtown Sidewalk and Lighting
Longview 1999-2001 Street Reconstruction
Longview Beaumont Street Reconstruction
Longview Tyler Street Reconstruction
Lufkin Paul Avenue Improvements
Lufkin Safe Routes to School Sidewalk
Lufkin Sayers Street
McKinney Oak Street Reconstruction
Mount Pleasant FM 1402 at IH-30
Selma Park Estates Subdivision 5 & 6
Selma Site Plan City of Selma Police Station
Seven Points TxCDBG Street Improvements
Southlake Drainage Master Plan Ph 2 SW3P
Sugar Land East GA Complex - Phase 1
Sugar Land Fire Station No. 1 and No. 7
Sugar Land L.I.D. No. 2 Culvert Headwall
Taylor Safe Routes to School
Terrell 2004 Street & Utility Rehabilitation
Terrell Colquitt Road Improvements
Tyler Sidewalk Improvements
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access