Tyler Street Reconstruction from High to Green
Longview Tyler Street Reconstruction from High to Green
Longview, Texas
This project involved the design of three urban city blocks of street in downtown Longview. The existing street section included brick pavement, concrete curb & gutters, concrete sidewalks, and underground water, sewer, and storm sewer pipelines. The existing streets and utilities were approximately 80 years old and had very little improvements or maintenance performed on them throughout their 80 year life. The project included removal of all street pavement, water, sewer and storm sewer facilities, and the sidewalk from the face of buildings across the street ROW to the opposite face of building. Public participation and coordination with adjacent property owners, tenants, and merchants was a key component to the project. Design and construction review meetings were held monthly over a 2 year period with block captains representing the merchants and business owners that were affected. The project area is the site of the very popular Alleyfest Festival that is held in downtown Longview in the Spring of each year.

Key elements of the project include new concrete pavement, landscaped medians, illuminated stop signs, bollards, benches, trash cans, display cases, gateway pylons, illuminated flagpoles, a monumental clock tower, water lines, sewer lines, storm sewer inlets and pipelines, grate inlets, recessed tie downs in the concrete pavement for festival tents, brick inlays in the sidewalks, extensive landscaping and irrigation, and decorative brick inlay star patterns at two street intersections.

Services provided by KSA Engineers, Inc. included publicity and public participation, boundary and topographic surveying, preparation of a ROW map, a geotechnical investigation, pavement design, horizontal and vertical geometrics design, signage and marking design, streetscape, landscaping, and irrigation design, storm sewer design, and the design of water and sewer lines. KSA was fully responsible for preparation of plans and specifications, and the administration of the bidding process and the construction. KSA also provided a project representative during construction and provided construction material testing using a subcontract with a testing laboratory.

Bastrop Colony MUD 1E Section 1
Deer Park Detention Study for 3 City Parcels
Diboll Dogwood Ridge Street Improvement
Grand Prairie Mayfield Road Improvements
Hico Safe Routes to School Sidewalks
Hondo Drainage Improvements, Project
Huntington Safe Routes to School
Kilgore Maverick Drive Improvements
Leander Bagdad Road
Llano Downtown Sidewalk and Lighting
Longview 1999-2001 Street Reconstruction
Longview Beaumont Street Reconstruction
Longview Tyler Street Reconstruction
Lufkin Paul Avenue Improvements
Lufkin Safe Routes to School Sidewalk
Lufkin Sayers Street
McKinney Oak Street Reconstruction
Mount Pleasant FM 1402 at IH-30
Selma Park Estates Subdivision 5 & 6
Selma Site Plan City of Selma Police Station
Seven Points TxCDBG Street Improvements
Southlake Drainage Master Plan Ph 2 SW3P
Sugar Land East GA Complex - Phase 1
Sugar Land Fire Station No. 1 and No. 7
Sugar Land L.I.D. No. 2 Culvert Headwall
Taylor Safe Routes to School
Terrell 2004 Street & Utility Rehabilitation
Terrell Colquitt Road Improvements
Tyler Sidewalk Improvements
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access