KSA Engineers, Inc. was hired by the City of Longview to design the renovation of the Sabine River Water Treatment Plant. The project included the construction of a new earthen raw water storage reservoir, low lift raw water pumps, powdered activated carbon pretreatment contact basin, relocation of the existing powdered activated carbon silo, site piping, and appurtenances.
KSA was responsible for the rehabilitation of eight dual media filters, including underdrains and media; repair of the high service pump station building foundation; and security system modifications at all three plants, all elevated storage tanks, and the booster pump station. |