Jacksboro Lift Station No. 2 Replacement
Jacksboro, Texas
Jacksboro Lift Station No. 2 Replacement
The City of Jacksboro was approached by several developers interested in developing property on the north side of the City near the
intersection of Hwy 148 and Hwy 281. The existing lift station in this area was not able to serve the proposed developments due to size
and location.

KSA was hired to work with the City and developers to design and construct a new lift station that would serve the immediate and future
needs of all nearby developments.

The existing lift station was converted to a manhole which allowed the waste to be transferred to the new lift station by gravity.

The project included:

  • 2,000 feet of 8-inch and 10-inch gravity sewer
  • 3 submersible pumps at 300 gpm each
  • 8-inch diameter wet well that was 20-feet deep
  • Standby generator
  • Security fencing
Austin High Service Pump Station #2
Copeland Road EST
Crockett Raw WTF
Diana USDA Funded Water System
Gladewater WTP Improve Phase I
Groesbeck Dam Improvements
Groesbeck Downtown EST Replacement
Groesbeck WDS
Houston WFI
Jacksboro Lift Station No. 2 Replacement
Jacksboro Lost Creek Dam Evaluation & Plan
Lake Palestine WTP
Longview George Richey Road 18"
Longview WTP
Marlin DWSRF WTP
Marlin Water Transmission Main
Mexia WTP
Mineola 500,000 EST
Morgan's Point Downtown EST
Mount Pleasant WTP
Nacogdoches EST
Nacogdoches Southside Ground Tank
Nacogdoches WTP
Reno TCDP Water System (ORCA)
Rockdale WDS
Selma EST
Selma HSPS
Selma Southside Water System -IH 35 Crossing
Sugar Land 16" Water Main Ext.; S.H.6 South
Sugar Land Levee District No. 2 Culvert
Copyright© 2010 by KSA Engineers Inc.,  Site Map | Employee Access